Referment

Technical product manager for construction scheduling

In short

A London-based company building an AI platform that forecasts delay and cost risk on major infrastructure projects is hiring a technical product manager to lead its generative AI scheduling product. The role involves reviewing AI-generated construction programmes, designing and shipping planning agents, running structured evaluations, and coordinating across squads. It demands five-plus years of hands-on experience as a planner or scheduler on major construction or infrastructure projects, deep fluency in Primavera P6, and daily hands-on use of AI tools including prototyping and reviewing code.

About the Role
Referment is working with a London-based company whose AI platform forecasts delay and cost risk on some of the world's most important infrastructure, trained on one of the largest datasets of construction schedules in existence. Its generative AI scheduling product is an AI-native way to author construction schedules, and it's hiring a planner to lead it.
Responsibilities
•Be the planner in the room — review generated programmes as you would a contractor's submission, find what's wrong, and turn that into product and model improvements.
•Own the squad's quarter: plan it, reconcile it against unplanned work, and deliver it, with genuine authority to make trade-offs.
•Build, not just brief: write clear specs, prompt agents, and review and edit generated output rather than handing over.
•Design and ship planning agents — what they should do, what they must never do, and where the planner stays in the loop.
•Run structured evaluations, defining what a good schedule looks like in measurable terms and proving every change against it.
•Run user and buyer research with planning managers, project controls leads and programme directors.
•Lead contributors, not a process, coordinating dependencies across squads.
Requirements
•Five-plus years as a planner or scheduler on major construction or infrastructure projects — building, maintaining and defending programmes that were contractually and commercially live.
•Deep fluency in Primavera P6 (Asta, MSP or TILOS a bonus): logic, calendars, constraints, baselines, WBS and coding structures.
•A clear point of view on schedule quality, and the experience of arguing about float and holding your ground.
•You already build with AI daily, and want to go further — to prototypes and working code you review and edit.
•Judgment over process: you can cut to what planners and their clients actually need and make the right call through understanding trade-offs.
•Fluent with data, and excited by defining schedule quality in a way that can be measured at scale.
•Sharp communication with engineers, planning managers and programme directors alike.
Nice to Have
•Product experience of any kind, or experience building planning tooling or automation for a team.
•Experience with data science, machine learning or probabilistic risk analysis (QSRA/QCRA).
•Experience across client and contractor sides or multiple sectors (rail, energy, nuclear, water, buildings, oil and gas).
•Knowledge of contract programme requirements under NEC, JCT or FIDIC.
•A formal technical background.
Conditions
No conditions stated in the posting.

Stop applying.
Get referred.

$10 in free credits

In just 60 seconds, fully on autopilot — Eraldt's AI agents read your CV, map the roles you fit, find live vacancies and the people who can refer you, write personal emails, and get you referred.

This isn't an application: your CV doesn't go to the company, and we don't promise a referral for this exact role.

Discover who else lands interviews on autopilot